Projects


Name
Images
Project Location
Client
Completion Date
Project Value
Details
Work Status
1
Jharli Railway Siding Works
IMG_20210605_144259.jpg
IMG_20210605_144136.jpg
IMG_20210605_150007.jpg
IMG_20210605_151312.jpg
IMG_20210605_150701.jpg
Jharli, Jhajjar, Haryana
Kalindee Rail Nirman (Engineers) Limited / Rites Ltd / NTPC
April 2011
₹175,000,000.00
Open
Completed
2
CPCL Construction of Ballasted Track
₹84,300,000.00
Open
Completed
3
Execution of ballastless track with existing sheer connectors for DMRC Project
Inderprastha station to Noida City Centre
DMRC/KRNEL
May-2009
₹210,000,000.00
Open
Completed
4
Laying of Ballastless Track & Turnouts at DMRC
Section Inderlok / Kirti Nagar to Mundka
DMRC/INDU
Jan-2010
₹148,100,000.00
Open
Completed
5
Track work DMRC Section for Line-6 Section for Delhi Metro Rail Corporation Project BT-7 and Installation of 1 in 9 ‘X’ Over
Central Secretariat to Badarpur
DMRC/INDU
Sept-2010
₹95,900,000.00
Open
Completed
6
Ballastless track installation along with Turnouts and Scissor on viaduct and underground Tunnel of Line - 3 & Line – 5 in Delhi” and “Ballastless track installation along with Turnouts on viaduct of Line – 5 in Haryana
Mundaka to Bahadurgarh and Dwarka to Najafgarh
DMRC/Larsen & Tourbro
Dec-2017
₹12,590,000.00
Open
Completed
7
Installation of ballastless track including turnouts under CT-1B contract of DMRC Line 7 at Delhi
IP Extension to Mayur Vihar
DMRC/Alstom
May-2018
₹43,600,000.00
Open
Completed
8
Installation of ballastless track including turnouts under T-05 contract of Maha Metro at Nagpur
T-05 Contract
MMRCL/RAHEE INFRATECH LIMITED
March-2019
₹92,600,000.00
Open
Completed
9
Construction of Ballastless Track work for Belapur-Pendhar corridor of Navi Mumbai Metro Rail Project Line-1 of CIDCO by Tata Project Ltd
WhatsApp Image 2018-10-28 at 1.55.29 PM.jpeg
WhatsApp Image 2018-10-28 at 1.55.30 PM.jpeg
WhatsApp Image 2018-10-28 at 1.55.33 PM (1).jpeg
WhatsApp Image 2018-10-28 at 1.55.33 PM.jpeg
WhatsApp Image 2018-10-28 at 1.55.34 PM (1).jpeg
WhatsApp Image 2018-10-28 at 1.55.34 PM (2).jpeg
WhatsApp Image 2018-10-28 at 1.55.34 PM.jpeg
WhatsApp Image 2018-10-28 at 1.55.35 PM (1).jpeg
WhatsApp Image 2018-10-28 at 1.55.35 PM (2).jpeg
WhatsApp Image 2018-10-28 at 1.55.35 PM.jpeg
Belapur to Pendhar
Tata Project Ltd
Jan-2023
₹591,600,000.00
Open
Completed
10
“Installation, Testing and Commissioning of Ballastless Track for Chennai Metro Phase-1 Extension Project” between Washermenpet and Wimco Nagar
Washermenpet to Wimco Nagar
Chennai Metro Rail Ltd
March-2022
₹610,500,000.00
Open
Completed
11
“Design, Supply, Installation, Testing and Commissioning of Standard Gauge Ballasted Track in Range Hill Depot and Ballastless Track for the Elevated Section of Reach-1 (Pimpri Chinchwad Municipal Corporation (PCMC) to Range Hill) of Pune Metro Rail Project”
Pimpri Chinchwad Municipal Corporation (PCMC) to Range Hill)
Maharashtra Metro Rail Corporation Ltd
Jan-2024
₹616,700,000.00
Open
Completed
12
“Design, Supply, Installation, Testing and Commissioning of Standard Gauge Ballasted Track in Vanaz Depot and Ballastless Track for the Elevated Sections of Reach-2 (Vanaz to Civil Court) of Pune Metro Rail Project”
Vanaz to Civil Court
Maharashtra Metro Rail Corporation Ltd
Jan-2024
₹547,700,000.00
Open
Completed
13
Laying of Ballast Less Track for priority section of Kanpur-Agra Metro Project
IIT to Motijheel
UPMRC/Larsen & Tourbro
Nov-2021
₹115,400,000.00
Open
Completed
14
Complete Railway Siding for 2X800 MW unit of NTPC Telangana Project including S&T and OHE at Ramagundam, Telangana, India
NTPC, Ramagundam
TataProject Ltd
June-24
₹1,470,000,000.00
Open
In-Progress
15
Proposed laying and linking of BG track, of Kazipet junction station yard (Approx 27 Kms) including Kazipet Junction yard
Kazipet
Dy. CE /C / KZJ
June-24
₹196,200,000.00
Open
In-Progress
16
Ballastless Track work for Mumbai Metro Line-3, Package-10B & 10C
Mumbai Line-3 Project
Larsen & Tourbro
Jan-24
₹115,400,000.00
Open
Completed
17
Railway works at Virochannagar near Ahmedabad, Gujarat.
Virochan Nagar
Adani Logistic Limited
Apr-24
₹600,000,000.00
Open
In-Progress
18
Civil and P.way work for Development of GCT of Hind Terminal Private Limited at Dalpatpur, Moradabad, U.P
Dalpatpur
Hind Terminal Pvt Ltd
June-24
₹111,900,000.00
Open
In-Progress
19
CONSTRUCTION, SUPPLY, ERECTION, TESTING AND COMMISIONING OF MAINLINE TRACK LINKING AND LAYING AT PUNE METRO LINE-3 PROJECT.
Pune Metro Line-3
TATA PROJECTS LIMITED
Jan-25
₹390,800,000.00
Open
In-Progress
20
CONSTRUCTION, SUPPLY, ERECTION, TESTING AND COMMISIONING OF DEPOT TRACK LINKING AND LAYING AT PUNE METRO LINE-3 PROJECT
Pune Metro Line-3
TATA PROJECTS LIMITED
Jan-25
₹21,800,000.00
Open
In-Progress
21
Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Mulund Fire Station [Ch. 18929.611 M] to Gaimukh of Line – 4 & 4A of Mumbai Metro Rail Project of MMRDA, Mumbai.
MMRDA Line 4 & 4A
Mumbai Metropolitan Region Development Authority (MMRDA)
Oct-25
₹1,210,000,000.00
Open
In-Progress